Skip to content
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 90% Polyamide 10% Elastane Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 90% Polyamide 10% Elastane Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 98% Cotton 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 98% Cotton 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 98% Cotton 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- Fabric: 100% Cotton regular denim, Fabric weight: 12.5 oz Product Feature: A paper Ladies colored denim Jacket is styled in a slouchy, oversized fit for everyday ease. Front button closure, Spread collar, Button cuffs, Chest button-flap pockets, Adjustable button side tabs 100% cotton, Machine wash,
- Read more
-
-
-
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 76.5% Cotton, 21% Polyester, 2.5% Elastane, 9.25 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 79% Cotton, 19% Polyester, 2% Elastane, 9.25 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 79% Cotton, 19% Polyester, 2% Elastane, 9.25 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 79% Cotton, 19% Polyester, 2% Elastane, 9.25 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 75% Cotton, 22% Polyester, 3% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 75% Cotton, 22% Polyester, 3% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 71% Cotton, 25% Polyester, 4% Elastane Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 75% Cotton, 22% Polyester, 3% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 76.5% Cotton, 21% Polyester, 2.5% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 76.5% Cotton, 21% Polyester, 2.5% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 76.5% Cotton, 21% Polyester, 2.5% Elastane, 9.25oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 85% Cotton, 12.5% Polyester, 2.5% Elastane, 9.75 oz Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
- Denim Bottoms, Shorts/Skirts, Women
-
Rated 0 out of 5
- 76.25% Cotton, 21.75% Polyester, 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- Ladies Denim Trouser Cotton 76.25% 21.75% Polyester Spandex 2% Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Tops, Women
-
Rated 0 out of 5
- 100% Cotton Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 77% Cotton 21% Polyester 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 58 BCI Cotton 10% Modal, 30% Repreve 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Tops, Women
-
Rated 0 out of 5
- 100% Cotton, Y/D Check Poplin Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW07: 95%Polyester, 5%Spandex; Light weight 95-100 GSM Sleeve less Nightdress with Chest pads, And lase on Neck & Hem Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 62% poly 33% rayon 5% elastan - 234gsm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 86% poly 14% elastan - 260gsm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 97% cotton 3% elastan - 194gsm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 98% cotton 2% elastan - 251gsm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
-
-
-
- Lingerie, Women
-
Rated 0 out of 5
- 90% cotton, 10% elastane Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Uniform
-
Rated 0 out of 5
- MFWUN01: 100% Viscose 2/2 Twill Solid Medium weight 155-160GSM Long Sleeve Uniform with Double Pocket Double Flap And Back to Nature Embroidery on Pocket Flap Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD06: Acrylic + Cotton + Spandex, soft to the touch and comfortable to wear Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD10: Acrylic + Cotton + Spandex, soft to the touch and comfortable to wear Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD05: Winter Warm Wool Pullover Sweater Inner Mongolia 2-ply cashmere and wool blend, medium thickness,5-gauge knit. Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Women's Cotton Lounge Triangle Bralette 95% Cotton, 5% Spandex Machine Wash Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS18: 100% Polyester Solid Light weight 110GSM Long Sleeve Blouse Neck Piping and Front Plackets Contrast Buttons Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD08: 100% Cotton and Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 90% Polyamide 10% Elastane Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Lingerie, Women
-
Rated 0 out of 5
- Fabrication: 100% Cotton S/J 140 GSM Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK02: 97% Cotton 3% Elastane Single Jersey Light weight 140-145GSM Women T with Butterfly Screen Print on Front Delivery Lead time : 70-90 Days for BD Fabric, 90-110 by imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Sleep Wear, Sports Wear, Women
-
Rated 0 out of 5
- Full Zip Tracksuits Sportswear with Pockets 100% Polyester Delivery Lead Time: 90-110 Days for China Fabric Size Range: XS-XXL
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS19: Light weight 115-120GSM Printed Long Sleeve Dresses with Neck Piping Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS08: 100% Rayon Print Light weight 130 GSM 3/4 Sleeve Printed Tunic with Sleeve Tabs Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWD22: 100% Tencel Light weight 5.5 to 6oz Long Sleeve Dresses with Broad Embroidery Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS20: 100% Polyester Printed Light weight 110GSM Long Sleeve Dresses with Front Pleats Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS15: 100% Viscose All Over Print Light weight 120-130 GSM 3/4 Sleeve Blouse with Back Neck Piping Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP03 98% cotton 2% spandex twill Medium weight 240GSM A/W 5 Pockets Slim Fit (Including Front Coin Pkt) and Back welt Pkts. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 100-110 Days Size Range: XS-XXL
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP01: 75% Cotton, 18% Polyester 5% Viscose 2% Spandex Medium weight 10.5 to 11.5oz Stretch Denim Zipper Closer Enzyme Bleach + Crinkle+ PP With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Dark Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP02: 98% Cotton, 2% Spandex Medium weight 10.5 to 11.5oz Stretch Denim Zipper Closer Enzyme + Acid wash With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP03: 75% Cotton, 18% Polyester 5% Viscose 2% Spandex Medium weight 350GSM B/W Stretch Denim Zipper Closer Enzyme wash + Whisker and PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Dark Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP05: 100% Cotton Regular Denim Medium weight 10.50 to 11.50oz Cotton Denim Zipper Closer Enzyme wash + Whisker and PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black like Photo Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP06: 98% cotton 2% spandex Medium weight 10.50 to 11.50oz CVC Denim Zipper Closer Enzyme wash + Whisker + PP Spray Destroy on knee with soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black. Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP07: 73% Cotton 25% Polyester 2% Spandex Slub Denim Medium weight 10.50 to 11.50oz Denim Zipper Closer Enzyme wash + Whisker and PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black like Photo Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP08: 73% Cotton 25% Polyester 2% Spandex Satin Denim (4/1 Satin) Medium weight 10.75 to 12oz Denim Zipper Closer Enzyme Bleach wash and PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP09: 79% Cotton 19% Polyester 2% Elastane Slub Denim Medium weight 9.50 to 10.25oz Denim Zipper Closer Enzyme Bleach wash and PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-2XL
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP10: 85% Cotton 12.5% Polyester 2.5% Elastane Slub Denim Medium weight 9.25 to 10oz Denim Zipper Closer Enzyme wash and PP Spray + Destroy With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP12: 60% Cotton 40% Polyester Slub Denim Medium weight 10.50 to 11.50oz CVC Denim Boot Cut + Back Pkts Emb Enzyme wash + Whisker + PP Spray Destroy with soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDP01: 71% Cotton, 25% Polyester 4% Spandex Medium weight 9.5 to 10oz Stretch Denim Zipper Closer and 4 Sank Buttons on WB Enzyme + PP Spray with soft Hand feeling Colors: Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sports Wear, Women
-
Rated 0 out of 5
- Yoga Gym Jogging Suits 88% Polyester/12% Spandex (Polyimide) Delivery Lead Time: 90-110 Days for China Fabric Size Range: XS-XXL
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- 98% Cotton 2% Spandex Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP01: 98% Cotton, 2% Spandex Peach Twill Medium weight 195 GSM A/W Stretch Twill Chino with Belt and Back welt Pockets make you Fit well. Enzyme Silicon + Softener With super soft Hand feel Delivery lead time : 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP02 98% Cotton, 2% Spandex Peach Twill Medium weight 195 GSM A/W Stretch Twill Chino with Belt and Back welt Pockets/Flaps make you Fit well. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK12: 100% Combed Cotton Pique Light weight 170-180GSM Women Short Sleeve Polo with Cotton YD Fabric Rolling on Sleeves Delivery Lead time: 75-90 Days for BD Fabric, 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK13: 65% Polyester 35% Cotton Combed Pique Light weight 180-190GSM Women Short Sleeve Buttoned Pique Polo Delivery Lead Time: 75-90 Days for BD Fabric, 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK14: 60% Cotton 40% Polyester Pique Light weight 190-195GSM Women Short Sleeve Polo with Button Closer Neck Delivery lead time: 75-90 Days for BD Fabric , 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS21: 100% Cotton Poplin AOP Light weight 115-120GSM Sleeve Less Dresses with Waist Elasticated Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWSS03: 65% Polyester, 35% Cotton Fleece with very soft feel Medium weight-260 GSM Causal Pullover with Floral Print Embroidery with Rib on Hem and Sleeve Cuff Delivery Lead Time: 75-90 Days 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWSS04: 60% Polyester, 40% Cotton 5% Spandex Fleece Medium weight-250GSM with soft in feel Causal Pullover with Love Embroidery on Chest and Rib on Hem & Sleeve Cuff Delivery Lead Time : 75-90 Days Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP07 98% Cotton, 2% Spandex Peach Twill Medium weight 270 GSM A/W Stretch Twill Regular Fit with Back welt Pockets. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW10: 98% Cotton, 2% Spandex S/D Peach Twill Weight 405GSM Stretch Twill garment dye Shorts with Back Pockets Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- Fabric: 100% Cotton colored denim shirt, Fabric weight: 10.5 oz Product Feature : Women’s Colored Denim Shirt features Two Front Chest Pockets, Collar, Button Closure, Machine wash and Long Sleeves with tab and button. Versatile to style, can be worn open or buttoned up. Soft and Lightweight Fabric - Provides a classic denim Jean look without compromising on comfort. Casual…
- Read more
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS05: 100% Cotton Twill S/D Peach Medium weight 250GSM Cotton Twill Shorts with Hem Rolling and Back welt Pockets. Enzyme Silicon + Softener With super soft Hand feel Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD03: 90% Polyester; 10% Spandex Double panel construction and reinforced seams. Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD04: 100% Acrylic Yarn Single panel construction and reinforced seams. Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD02: 100% Premiere Acrylic yarn Double panel construction and reinforced seams. Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP04 60% Cotton 40% Polyester Twill Medium weight 238GSM B/W CVC Twill Pant with front 4 Pleats Back welt Pockets with Straight Fit. Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW08: 60% Cotton 40% Polyester Twill Medium weight 238GSM CVC Twill Shorts with Patch Pockets Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDC13: 98% Cotton, 2% Spandex Medium weight 10 to 11oz Stretch Denim Zipper Closer+ Back Pockets Emb Enzyme + Bleach + PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Bottoms, Women
-
Rated 0 out of 5
- MFWDJ14: 98% Cotton, 2% Spandex Medium weight 7 to 9oz Stretch Denim Zipper Closer+ Back Pockets Emb Enzyme + Bleach + PP Spray With soft Hand feeling Colors: Dark Blue/Medium Blue/Light Blue and Black Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Tops, Tops, Women
-
Rated 0 out of 5
- 100% Cotton Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Payment term: LC or TT
- Read more
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS06: 75% Cotton 23% Polyester 2% Spandex Ring Slub Denim Medium weight 8.5 to 9oz Zipper Closer with Folded Hem. Slub Denim with Heavy Enzyme+ Bleach +PP Spray with soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS08: 98% Cotton 2% Spandex Denim Medium weight 10 to 11.5oz Zipper Closer Back Normal Pockets. Regular Denim with Heavy Enzyme + Bleach +Whisker + PP Spray With soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS09: 100% Cotton Regular Denim Medium weight 9 to 10.5oz Zipper Closer Back Normal Pockets. Regular Denim with Heavy Enzyme + Bleach +Crinkle + PP Spray With soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWQJ09: 100% Polyester Taffeta with Poly Feeling/Quilting Double Zip Through Quilting Jacket with High Neck and Rib on Sleeve Hems to feel you warm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW11: 100% Cotton Peach Twill Medium weight 180GSM Cotton Twill Shorts with Front Pockets Flaps and Back Welt Pockets Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWH06: 100% Polyester Fleece 300 GSM Fleece Hoodie with Contrast Draw cord and Kangaroo Pockets. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWH07: 55% Cotton 45% Polyester Fleece Medium Weight-300 GSM Hood Lining-Cotton Single Jersey Fleece Hoodie with DTM Draw cord and Kangaroo Pockets. Delivery Lead time : 75-90 Days for BD Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWTR08 100% Poly Fleece Terri 350GSM B/W Polyester Fleece Jogger pant with RIB on WB and Hem. Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 60-90 Days for BD Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWTR12 60% Cotton 40% Poly Fleece ,320 GSM B/W Polyester Fleece Jogger pant with Elastic on WB and Hem loose Fitting. Silicon + Softener wash With super soft Hand feel Delivery lead time: 60-90 Days for BD Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Sports Wear, Women
-
Rated 0 out of 5
- 80/20 CVC Fleece Terri 320-350GSM B/W Polyester Fleece Jogger pant with Elasticated waist Band and Rib on Hem. Silicon + Softener wash With super soft Hand feeling Delivery Lead Time:60-90 Days for BD Fabric Size Range: XS-XXL
- Contact
-
-
- Sports Wear, Women
-
Rated 0 out of 5
- 60/40 Fleece 280 GSM Cotton Fleece Jogger pant with Elasticated waist Band-Drawcord and Rib on Hem. Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 60-90 Days for BD Fabric Size Range: XS-XXL
- Contact
-
-
- Sports Wear, Women
-
Rated 0 out of 5
- 100% Poly Fleece 280-300 GSM Polyester Fleece Sleeve Less Sports Zip Through Jacket with front 2 zipper Pockets. Delivery Lead Time: 90-110 Days for China Fabric 60-90 Days for BD Fabric Size Range: XS-XXL
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK05: 60% Cotton 40% Polyester Single Jersey Light weight 145-150GSM Women T with floral print to make you Beauty Delivery Lead Time: 70-90 Days for BD Fabric , 90-110 days for Imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK07: 100% Combed Cotton Single Jersey Light weight 145-150GSM Women T with floral print and Neck Buttons Delivery Lead time: 75-90 Days for BD Fabric, 90-110 Days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWD25: 100% Polyester Georgette Printed-90GSM With 100% Cotton Voile Lining-65GSM Long Dress with inner Voile Lining all through Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWD23: 100% Polyester Georgette-90GSM With 100% Cotton Voile Lining-65GSM Long Dress with inner Voile Lining all through Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK03: 100% Cotton Single Jersey Light weight 130-135GSM Women T with Hem Elasticated Design and Front Screen Print Delivery Lead time : 70-90 Days for BD Fabric, 90-110 days by Imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWH01: 100% Nylon 228T Taslon with Dull finish Taslon Hoodie Jacket with Front Metal Buttons and Elasticated Sleeve Hem Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Hoodies & Sweat Shirts, Women
-
Rated 0 out of 5
- MFWHS05: 100% Cotton YD Flannel Both Side Brushed Weight-4.45oz Hood Lining-Cotton Single Jersey Silicon and softener wash with soft hand feeling Delivery Lead time: 75-90 Days for BD Fabric 110-120 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK11: 50% Cotton 50% Polyester Jersey Light weight 170-180GSM Women Short Sleeve Polo with Cotton YD Fabric Rolling on Sleeves Delivery Lead Time: 75-90 Days for BD Fabric, 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWTR08 100% Nylon 228T Taslon with Dull finish, Light weight 105GSM B/W Nylon Jogger pant with Contrast Drawstring on WB Silicon + Softener wash With super soft Hand feeling Delivery L/T: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWTR10 100% Nylon 228T Taslon with Dull finish, Light weight 105GSM B/W Nylon Jogger pant with Elastic Cord on Hem Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 90-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWTR11 100% cotton Medium weight 255GSM B/W 100% virgin yarn cotton fabric with DTM Drawstring on WB , Enzyme silicon with stone heavy wash to get super hand feel and good look. Delivery L/T: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWSW05: 100% Rayon Yarn Dyed Light weight 160-165GSM Long Sleeve with lapel Collar and Chest Pocket Tops & Elasticated Trouser with folded Hem Silicon/ Softener Wash with super hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD07: 55% Cotton, 25% Modal, 20% Polyester Ribbed cuffs, hem, and collar complete the look of this comfy-casual sweater in cotton-blend fabric Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW06: 100% Polyester Georgette Light weight 90/95GSM 3/4 Sleeve Long nightdress with Lase on Neck Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS06: 100% Polyester Solid Light weight 110GSM Long Sleeve Blouse with 1 Chest Pocket Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh Local fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWDJT01: 100% Cotton Denim weight 11.5 to 12oz Denim jacket With Metal logo button And Back Screen print. Heavy Enzyme+ Stone with super Hand feel Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWDJ02: 100% Cotton Denim Weight 11.5 to 12oz Denim Jacket With Metal logo button, Heavy Enzyme+ Bleach with super Hand feel Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWDJ03: 100% Cotton Denim Weight 11.5 to 12oz Denim Jacket With Metal logo button And Back Screen print. Heavy Enzyme+ Stone + Destroy with super Hand feeling. Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWDJ04: 100% Cotton Denim Weight 11.5 to 12oz Denim jacket With Metal logo button Heavy Enzyme+ Bleach+ Scratches with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWDJ05: 100% Cotton Denim Weight 11.5 to 12oz Zip Through Denim jacket with Elastic Hem And Sleeve Cuffs Heavy Enzyme+ Stone with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST06: 100% Cotton Printed Denim Light weight 5.5 to 6oz Regular Denim with Heavy Enzyme With super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms: L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST13: 100% Tencel Print Light weight 6oz Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS09: 100% Cotton Poplin AOP Light weight 105GSM Long Sleeve Shirt no Pockets Silicon Softener wash Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS10: 60% Cotton 38% Poly 2% Spandex Poplin (Dot. Print) Light weight 110-115 GSM,long Sleeve Shirt 1 Chest Pocket Delivery Lead Time: 100-110 Days for Imported Fabric , 80-90 days for Bangladesh local fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS11: 100% Cotton Slub Printed Light weight 110-115 GSM Long Sleeve Shirt with Double Pockets and Sleeve Tabs Silicon Softener with super hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric , 75-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS12: 100% Cotton Y/D Flannel (Both Side Brushed) Light weight 4.45oz Long Sleeve Shirt Double Pockets + Flaps Silicon, Softener wash with super soft hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric , 80-90 days for Bangladesh local fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS13: 100% Cotton Y/D Mélange Herringbone Light weight 4.25-4.50oz Long Sleeve Shirt Double Pockets + Flaps Silicon, Softener wash with super soft hand feeling Delivery Lead Time: 110-120 Days for Imported Fabric , 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS14: 100% Cotton Corduroy , Light weight 125-130GSM Long Sleeve Shirt 1Pocket Silicon, Softener wash with super soft hand feeling Delivery L/T: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST01: 100% Cotton Regular Denim Light weight 5.5 to 6oz Double Pocket, Double Flap, with Snaps . Regular Denim with Heavy Enzyme With PP spray with super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST02: 72% Cotton ,26% polyester ,2% Spandex satin denim Light weight 5.5 to 6.5 oz Double Pocket, Double Flap, with Snaps . Regular Denim with Heavy Enzyme + Bleach with PP spray with super Hand feeling. Colors: Medium blue/Light Blue Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C…
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST03: 98% Cotton, 2% spandex Light weight 5.5 to 6oz Double Pocket with Snaps . Regular Denim with Heavy Enzyme With PP spray with super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWDST05: 60% Cotton ,40%$ Polyester Denim Light weight 6 to 6.5oz Double Pocket, Double Flap . Regular Denim with Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms: L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST07: 75% Cotton , 25% polyester Denim Light weight 6.5 to 7oz Metal Logo button with pocket piping Heavy Enzyme With PP spray with super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT payment
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK10: 95% Rayon 5% Elastane Single Jersey Light weight 140-150GSM Women Long Sleeve T-Shirt Delivery Lead time: 75-90 Days for BD Fabric, 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK15: 95% Cotton 5% Elastane Single Jersey Light weight 140-145 GSM Women Long Sleeve T with Screen Print Delivery lead time: 75-90 Days for BD Fabric , 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST08: 100% Cotton Regular Denim Light weight 7 to 8oz Double Pocket, Double Flap waist Elastic Band with Drawstring Regular Denim with Heavy Enzyme With super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST14: 100% Tencel Print Light weight 6oz Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms: L/C or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD09: 100% Acrylic This crop sweater features a V-shape neckline, ripped trim around sleeves and hem for a casual and chic look Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST04: 100% Tencel Light weight 5.5 to 6oz Double Pocket, Double Flap, with Snaps . Regular Denim with Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms: L/C or TT payment
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK06: 60% Cotton 40% Polyester Single Jersey Light weight 145-150GSM Women T with Love print to make you Beauty Delivery Lead time: 75-90 Days for BD Fabric, 90-110 days for Imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS07: 100% Polyester Printed Light weight 115GSM Long Sleeve Blouse with super soft hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric, 75-90 days for local Bangladesh fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP06 97% Cotton, 3% Spandex Twill Peach Finish Medium weight 245 GSM A/W Stretch Twill with Decorative stitches on Knee Back basic Pockets in Regular Fit. Enzyme Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Sports Wear, Women
-
Rated 0 out of 5
- 95/5 Poly/spandex Fleece, Fabric weight: 260 100% Polyester pinhole mesh inserts Full Zip Through Golf and Tennis Jacket with 2 Bottom Pockets Delivery Lead Time: 90-110 Days for China Fabric 60-90 Days for BD Fabric Size Range: XS-XXL
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW07: 100% Cotton Peach Twill Light weight 185GSM Cotton Twill Shorts with Front Pleats and Coin Pocket with Flap Silicon + Softener wash With super soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWTJ07: 98% Cotton, 2% Spandex Peach Twill Medium weight 230GSM A/W Stretch Twill 4 Pockets Jacket waist Elasticated to feel you Comfort n warm. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW06: 100% Cotton Poplin Peach Medium weight 155GSM Peach Poplin Shorts with Contrast Button and Rivets Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW01: 100% Viscose Printed Light weight 130 GSM Long Sleeve Printed Night Dress Delivery L/T: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK01: 60% Cotton 40% Polyester Single Jersey Light weight 140-150GSM Women T-shirt with All over print Delivery Lead Time: 70-90 Days for BD Fabric, 90-110 days by imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWSH09: 100% Polyester Taffeta with Poly Feeling/Quilting+ Sherpa Quilting Hoodie Jacket with Front Side Pockets and Sherpa hoodie with Rib Sleeve Cuff Delivery Lead time: 75-90 Days for BD Fabric 110-120 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS04: 100% Cotton Peach Twill Light weight 150GSM Cotton Twill Shorts with Front Self Pockets Waist Rib + Self Draw cord Silicon + Softener wash With super soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Sweater/Cardigans, Women
-
Rated 0 out of 5
- MFWCD01: 100% Premiere Acrylic yarn Double panel construction and reinforced seams. Machine washable . Delivery Lead Time: 75-90 Days Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW02: 96% Polyester 4% Elastane Satin Light weight 95-100 GSM Sleeve Less Night Wear with lase ribbon on hem Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW04: 96% Polyester 4% Elastane Satin Light weight 95-100 GSM Sleeve Less Night Wear with lays ribbon on hem Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- MFWP05 100% Cotton Peach Twill Light weight 180GSM B/W Cotton Peach Finish Twill with D-Ring and self Belt and front pleats Regular Fit pant. Silicon + Softener wash With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS01: 100% Cotton Regular Denim Medium weight 10 to 11.5oz Zipper Closer Back Normal Pockets. Regular Denim with Heavy Enzyme + Bleach +Destroy + Hem Grinding With soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- 72% Cotton 26% Polyester 2% Spandex Satin Denim (4/1 Satin) Medium weight 8.75 to 9.50oz Zipper Closer with Folded Hem. Satin Denim with Heavy Enzyme+ Whisker Hem Grinding w/soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS02: 97% Cotton, 3% Spandex Twill Medium weight 285GSM Stretch Twill Sexy Shorts with Back welt Pockets make you Fit well. Enzyme Silicon + Softener With super soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL MOQ: 3,000 Piece Payment term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS03: 65% Polyester 35% Cotton Twill Medium weight 240GSM TC Twill Shorts with Belt and Back Normal Pockets. Silicon + Softener With super soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS01: 100% Cotton Regular Denim Medium weight 10 to 11.5oz Zipper Closer Back Normal Pockets. Regular Denim with Heavy Enzyme + Bleach +Destroy + Hem Grinding With soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS02: 72% Cotton 26% Polyester 2% Spandex Satin Denim (4/1 Satin) Medium weight 8.75 to 9.50oz Zipper Closer with Folded Hem. Slub Denim with Heavy Enzyme+ Whisker Hem Grinding w/soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS03: 100% Cotton Slub Denim Medium weight 8.50 to 9.30oz Zipper Closer w/Back Pkts Embroidery Slub Denim with Heavy Enzyme+ Bleach +Destroy +Scratches+ Hem Grinding with soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS04: 100% Cotton Slub Denim Medium weight 8.50 to 9.30oz Zipper Closer with Back Pkts Embroidery Slub Denim with Heavy Enzyme+ Bleach +Scratches with soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS07: 100% Cotton Regular Black Denim Medium weight 10.50 to 11.50oz Zipper Closer with Folded Hem Denim with Heavy Enzyme wash With soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWDS10: 100% Tencel-weight 6 to 7oz Flexible waist with self Drawstring Tencel Denim with Heavy Enzyme And Bleach wash with soft Hand feeling 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS02: 97% Cotton, 3% Spandex Twill Medium weight 285GSM Stretch Twill Sexy Shorts with Back welt Pockets make you Fit well. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST09: 100% Cotton Regular Denim Light weight 6 to 6.5oz Double Pocket, Double Flap, with Snaps . Regular Denim with Heavy Enzyme With PP spray with super Hand feeling. Colors: Dark Blue/ Medium blue/Light Blue. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST11: 100% Tencel Light weight 6.5oz Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT payment
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFWS01: 98% Cotton, 2% Spandex Peach Twill Medium weight 230GSM Stretch Twill Shorts with Belt Loops Hem Rolling make you looks well. Enzyme Silicon + Softener With super soft Hand feeling Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Shorts/Skirts, Women
-
Rated 0 out of 5
- MFSW09: 98% Cotton, 2% Spandex S/D Peach Twill Medium weight 315GSM Stretch Twill 5 Pockets Garment dye Shorts Back welt Pockets make you Fit well. Enzyme Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT
- Contact
-
-
- Uniform, Women
-
Rated 0 out of 5
- MFWUN02: 79% Polyester, 18% Rayon, 3% Spandex Inner Lining-100% Polyester Taffeta All around elasticated waist Skirt Long Sleeve Uniform with Lapel Collar and Batch Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK04: 65% Cotton 35% Polyester Single Jersey Light weight 120-130GSM Women Sleeve Less T to feel you comfort Delivery Lead time : 75-90 Days for BD Fabric , 90-110 days by Imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK08: 95% Cotton 5% Elastane Single Jersey Light weight 130-140GSM Women Sleeve Less T with Screen Print Delivery Lead Time: 75-90 Days for BD Fabric, 90-110 days for imported fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST10: 100% Tencel Light weight 6oz Heavy Enzyme with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms: L/C or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- MFWDST12: 100% Tencel Light weight 6oz Heavy Enzyme + Bleach with super Hand feeling. Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment terms : L/C or TT Payment
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWD24: 100% Polyester Printed-115GSM With 100% Cotton Single Jercey-120GSS Long Dress with inner Knit Lining all through Delivery Lead Time: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS05: 100% Viscose AOP Light weight 120-130GSM Short Sleeve Blouse with Back Neck Piping Delivery Lead Time: 100-110 Days for Imported Fabric, 75-90 days for Bangladesh Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS01: 100% Viscose AOP Plain Light weight 105-110GSM Camp Collar Short Sleeve Shirt with Bright Colors. Delivery L/T: 100-110 Days for Imported Fabric Size Range: XS-XXL MOQ: 3,000 piece Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS04: 100% Polyester Georgette Printed Light weight 85/90GSM Short Sleeve Blouse with Neck Through Hanging Piping Delivery L/T: 100-110 Days for Imported Fabric , 75-90 days for Bangladesh Fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS16: 100% Polyester Georgette Printed Light weight 90/95GSM 3/4 Sleeve Blouse with Smocking on Hem and Sleeve Cuffs Delivery Lead Time: 100-110 Days for Imported Fabric , 80-90 days for Local Bangladesh fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS02: 55% Linen 45% Cotton Y/D Light weight 120/125 GSM Short Sleeve with Double Pocket Double Flap Shirt Silicon/ Softener Wash with super hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric , 75-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Tops, Women
-
Rated 0 out of 5
- MFWS03: 100% Cotton Non Stretch End on End Light weight , 120-130 gsm Short Sleeve Shirt with Double Pocket Double Flap and Epaulets on Shoulder. Silicon/ Softener Wash with super hand feeling Delivery Lead Time: 100-110 Days for Imported Fabric 80-90 days lead time for Bangladesh Fabric Size Range: XS-XXL Payment Term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWBL11: 65% Polyester 31% Rayon 4% Spandex Lining-100% Polyester Stretch Blazer with Polyester inner Lining Delivery L/T: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- T-Shirts/Polo Shirts/Tank Top, Women
-
Rated 0 out of 5
- MFWK09: 95% Cotton 5% Elastane yarn dye Single Jersey Light weight 140-150GSM Women Striped T-Shirt Delivery Lead Time: 70-90 Days for BD Fabric , 90-110 days for imported fabric Size Range: XS-3XL Payment Term: LC or TT.
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- Fabric: 100% Cotton Black regular denim, Fabric weight: 12.5 oz Product Feature : Tie-dyed in classic denim, Jacket features yellow & pink bleached tie-dye denim exterior, oversized fit, button front, chest pockets, & standard collar. 100% Cotton Black regular denim, Machine wash
- Read more
-
-
-
- Denim Bottoms, Pants/Trousers/Capri, Women
-
Rated 0 out of 5
- Fabric: 80% Cotton 20% Polyester regular denim, Fabric weight: 12.5 oz Product Feature : A classic slim, Machine wash, straight-leg jean new heavyweight rigid denim that softens more and more over time for a custom fit and comfort. Sits at the natural waist and is slim through the hip, thigh and straight leg that hits at the ankle. Complete with…
- Read more
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWTJS08: 100% Cotton 7X7 Twill-3/1 RHT Weight 385 GSM B/W Twill Jacket with Metal Shank Enzyme/Stone with Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWTJ06: 100% Cotton 7X7 Twill-3/1 RHT Weight 385 GSM B/W Short Jacket with Metal Shank Enzyme/Stone with Silicon + Softener With super soft Hand feeling Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Uniform, Women
-
Rated 0 out of 5
- MFWUN04: 65% Polyester 35% Cotton, Heavy-duty Poplin Buttoned Back Belt & Five Button Front closure Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Uniform, Women
-
Rated 0 out of 5
- MFWUN05: Ladies Housekeeping Tunic 100% Polyester Front and Back Princes Seam Contrasting Collar and Cuff Two abysmal Hip Pockets Delivery L/T: 100-110 Days for Imported Fabric, 80-90 days for Bangladesh local fabric. Price: $5.00 - $6.00
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWWC10: Blended Wool with Inner Lining: 100% Polyester Button Through Trench Coat feel you warm Delivery Lead Time: 75-90 Days for BD Fabric 100-110 Days for Imported Fabric Size Range: XS-XXL Payment term: LC or TT.
- Contact
-
-
- Sleep Wear, Women
-
Rated 0 out of 5
- MFWNW03: 60% Cotton 38% Polyester 2% Spandex Light weight 115 GSM Long Sleeve Printed Night Dress Delivery Lead Time: 100-110 Days for Imported Fabric Size Range: XS-XXL Payment Term: LC or TT
- Contact
-
-
- Outer Wear/Jackets, Women
-
Rated 0 out of 5
- MFWSH08: 100% Polyester Taffeta with Poly Feeling/Quilting Zip Through Quilting Jacket with Front Side Pockets and Chest Pocket Zippers with Sleeve Hem Rib and Hooded with Sherpa Delivery Lead Time: 75-90 Days for BD Fabric 110-120 Days for Imported Fabric Size Range: XS-XXL Payment Terms: LC or TT
- Contact
-
-
- Denim Tops, Women
-
Rated 0 out of 5
- Fabric: 100% Cotton Denim, Fabric weight: 12.5 oz Product Feature: Long jacket in washed denim with 3/4-length sleeves. Collar, buttons at front and at cuffs, font 3 pockets. Adjustable tab and button at sides of hem.
- Read more
-
-